K3FY
  • Home
  • Factory Five Racing GTM
  • Blog
  • Contact
  • Machines
  • Drift Projects with my son Brian
  • Baumann Siderloader Rebuild
  • Tools
  • My Ham Shack
  • Drag Car

K3FY

  • Home/
  • Factory Five Racing GTM/
  • Blog/
  • Contact/
  • Machines/
  • Drift Projects with my son Brian/
  • Baumann Siderloader Rebuild/
  • Tools/
  • My Ham Shack/
  • Drag Car/

K3FY

Blog

K3FY

  • Home/
  • Factory Five Racing GTM/
  • Blog/
  • Contact/
  • Machines/
  • Drift Projects with my son Brian/
  • Baumann Siderloader Rebuild/
  • Tools/
  • My Ham Shack/
  • Drag Car/
April 01, 2013

Radiant System Initial Test

April 01, 2013/ Mark Holzbach

Fired up upper floor of radiant heat system on Saturday ​3/30.  Working OK so far.  Next purge air and fire up lower floor.  Then fine tune flow rates. 

​

2013-03-30_15-15-03_720.jpg
April 01, 2013/ Mark Holzbach/ Comment

Mark Holzbach

  • Blog
  • Visited Tech Shop Pittsburgh
  • Home/
  • Factory Five Racing GTM/
  • Blog/
  • Contact/
  • Machines/
  • Drift Projects with my son Brian/
  • Baumann Siderloader Rebuild/
  • Tools/
  • My Ham Shack/
  • Drag Car/

K3FY